How Much Does Excavation and Dirt Work Cost in Mississippi?
A national cost guide puts a normal excavation job at $1,659 to $6,712. Its average is $3,975, which is where most residential jobs land. A small dig on dry, open ground sits near the bottom of that range. Wet clay and a long haul push a job toward the top, or past it.
These are market numbers, not our price list. We are based in Waynesboro in Wayne County and do excavation and dirt work across southeast Mississippi. On any site, the price comes down to how much dirt moves and how far it travels.
What do national cost guides say excavation costs?
Cost guides price dirt work by the job, by the hour or by the cubic yard. A cubic yard is a block of dirt 3 feet long, 3 feet wide and 3 feet deep. The table pulls the main line items from national cost guides.
| Job or line item | National guide range | What moves it |
|---|---|---|
| A whole excavation job | $1,659 to $6,712, average $3,975 | How much dirt moves, the soil and the way in |
| Equipment with an operator, by the hour | $100 to $250 an hour | The size of machine your site can take |
| Cut and fill, per cubic yard | $1 to $12 | The soil and how far the dirt moves on the site |
| Dirt removal or hauling, per cubic yard | $8 to $25 | The haul distance |
| Yard grading | $400 to $6,500 | The size of the yard and how much dirt moves |
| A delivered truckload of fill dirt | $344 to $1,339 | The size of the load and the distance from the supplier |
Hourly rates cover the machine and an operator. One guide prices a compact skid steer or backhoe with an operator at $100 an hour.
House pads and land clearing have their own guides. See site prep for a new house for pad costs, and land clearing cost per acre for clearing.
What moves the price of dirt work in south Mississippi?
Clay. One national cost guide says clay-heavy soil can add $200 to $1,200 or more to a job. NRCS soil descriptions call Lorman, a clay soil common in Wayne County, very slowly permeable. That means water soaks through it very slowly. Smithdale, the county’s most common soil, is different: well drained, on ridge tops and hill slopes.
Rain. NOAA’s climate normals give Waynesboro about 60 inches of rain a year. December through March is the wettest stretch, and October is the driest month. One cost guide notes that rain can delay a job and make a site unsafe for heavy equipment.
Wet soils. Savannah soils hold a perched water table 1.5 to 3.0 feet down from January to March, per NRCS. Savannah loam covers about a third of the ground around Ellisville in NRCS soil maps. Creek bottoms are wetter still. In Bibb creek-bottom soils, the water table sits within 8 inches of the surface 6 to 11 months a year.
The way in. One national cost guide says your site’s access decides which machine shows up. A full-size excavator runs roughly 50 percent more per hour than a compact skid steer or backhoe, in that guide.
Haul distance. Moving dirt a couple of hundred feet costs far less than trucking it five miles, that guide says. In the table above, hauling runs higher per cubic yard than cut and fill on the site. When the high side of a site can fill the low side, less dirt has to leave.
Fill brought in. A low site may need fill dirt hauled in by the truckload. A national cost guide puts each delivered truckload at $344 to $1,339. It adds that delivery costs more for large loads, remote sites and places that are hard to reach. For how many loads a house pad takes, see what fill dirt for a house pad costs.
Does dirt work need a permit or an 811 call in Mississippi?
The state’s construction stormwater permits come from MDEQ. Its Small Construction General Permit covers construction that disturbs 1 acre to less than 5 acres. Its Large Construction General Permit covers clearing, grading, excavating and other land disturbance of 5 or more acres. On a large site, the owner submits a notice of intent with a site-specific stormwater pollution prevention plan.
Not every dirt job counts. The small permit leaves out routine upkeep, such as maintaining existing ditches and routine grading of existing dirt roads. Where a permit applies, its erosion and sediment controls add to the cost. Cities and counties set their own rules too, so check with yours before work starts.
Mississippi law requires whoever digs to submit an 811 locate request 3 to 10 working days before digging. For underground utilities, one national cost guide puts standard trenching at $5 to $12 per linear foot.
What should a written dirt work quote cover?
A written quote lets you compare bids line by line. It should spell out:
- What gets dug, cut, filled or graded, and the finished grade.
- How much dirt leaves the site, and where it goes.
- How much fill comes in, what kind, and how many cubic yards each load holds.
- Whether the price is for the whole job, by the hour or by the cubic yard.
- What happens to the schedule if rain stops the work.
- What the ground looks like when the job is done.
How do you get a price for your own dirt work?
National ranges are a starting point, and your site has its own soil and its own haul. See how we handle excavation and dirt work on residential, commercial and industrial sites. Our own trucks haul the dirt in and out.
We look at the site, or you send photos and a pin, and we put the quote in writing. Call or text (601) 410-5339.